CSX Case Study
Industrial Wastewater Treatment Facility
New Orleans, LA
New Orleans, LA
Job Details
- Installed a DAF System, Oil/Water Separator,
- Flash/Floc Mixer, and associated piping
- Constructed a 63′ x 30′ concrete slab on 28 piles Installed a 2,000 gallon sludge tank
- Installed controls and wiring
- Replaced existing lagoon pumps
- Installed all interconnecting and underground piping
Project Location: | New Orleans, LA |
Project Cost: | $1,354,544.00 |
Date Completed: | July, 2015 |
Owner: | CSX |
Engineer: | Arcadis |