Rathbun Regional Water Association Case Study
2007 Water System Improvements ‐ Contract ‘B2’ Water Treatment Plant
Job Details
- New 6.0 mgd water treatment facility
- Completion of project started by another contractor who was removed after 45% completion
- Concrete clear well and in‐ground tanks
- High service pump / electrical building
- 2 each vertical turbine Pumps; 3000 gpm, 300 hp
- Surge control system
- 8 each Sand Media Multi-wash Central Gravity Filters
- 2 each high-rate, pulsating sludge blanket clarifiers in new concrete basins; 2,292 gpm capacity
- Rotary positive displacement blower; 1080 icfm
- Chemical storage and feed equipment
Project Location: | Centerville, IA |
Project Cost: | $8,135,152.00 |
Date Completed: | October, 2013 |
Owner: | Rathbun Regional Water Assoc. |
Engineer: | McClure Engineering |