MSD of Greater Cincinnati Case Study
Mill Creek WWTP Secondary Improvements Project
Cincinnati, OH
Cincinnati, OH
Job Details
- Replaced eighteen (18) ‐ 105′ diameter square clarifier mechanisms
- Installed eighteen (18) RAS pumps and 30″ through 60″ RAS distribution piping
- Installed six (6) WAS pumps and converted the existing RAS Wetwell to
- a WAS and Skimmings Wetwell
- Installed eighteen (18) motor operated rotating scum troughs
- Replaced sixteen (16) ‐ 7 ‘x 9’ motor operated rectangular butterfly valves
- Constructed a new electrical building containing medium voltage switchgear and pump VFD’s
- Integrated new system with the existing plant Supervisory Control and Data Acquisition
Project Location: | Cincinnati, Ohio |
Project Cost: | $25,538,701.00 |
Date Completed: | April, 2013 |
Owner: | MSD of Greater Cincinnati |
Engineer: | Jacobs/Black & Veatch |