Sanitation District No.1 Case Study
Dry Creek Waste Water Treatment Plant Final Clarifier Modifications
Job Details
- Replaced six (6) existing 131’‐0″ diameter final clarifier mechanisms
- Replaced FRP trough, wire, and baffle in six (6) existing final clarifiers
- Replaced six (6) existing 14″, 3500 gpm horizontal non‐clog RAS pump.
- Replaced piping and valves.
- Replaced discharge piping of three (3) secondary skimmings pumps.
- Replaced discharge piping of one (1) drainage pump.
- Constructed new MCC Room.
- Replaced two (2) existing 30″ sluice gates.
Project Location: | Villa Hills, KY |
Project Cost: | $5,029,827.00 |
Date Completed: | May, 2011 |
Owner: | Sanitation District No.1 |
Engineer: | Hazen & Sawyer |