Dean Foods Case Study
WWTP Upgrades
McKinney, Texas
McKinney, Texas
Job Details
- Provided and installed a new pump well
- Installed a 300,000 gallon metal glass-coated aeration tank
- Installed an aeration and blower system for storage tank
- Installed an Odor Control System for the storage tank
- Assembled a prefabricated chemical building
- Assembled a prefabricated electrical building
- Installed site underground piping and electric
- Poured new concrete driveways and site restoration
- Provided start up and training
Project Location: | McKinney, Texas |
Project Cost: | $1,677,000.00 |
Date Completed: | February, 2012 |
Owner: | Dean Foods |
Engineer: | Brown & Caldwell |